Grange Quarry have established a new concrete depot near Dalbeattie, the plant is now open for action The Plant was aquired by Grange in May of 2016 and has been used on large flooring jobs and wind farms to date. It will now become a static plant serving the Stewartry area

The plant is a Nisbau Euromix 120. It has a huge output capacity courtesy of a 3m3 twin shaft mixer and delivery system which can produce an output of up to 120m3 per hour(2m3 per minute).

20170214 114315

The plant will hold BSI Third Party Accreditation to BS8500 (Kitemark) and provide a full range of concrete mixes. The aggregates in use will be supplied from Grange own quarry Kelhead near Annan. Kelhead aggregate is produced under strict factory production control conditions and CE marked to the requirements of BS EN 12620. All concrete supplied will therefor be manufactured to the highest industry standard.  See full pictures in the Dalbeattie Gallery

20170214 114620

Grange use only high performance admixtures designed to extend the working life of every batch of concrete and so the plant will be capable of providing a regular radial mileage of supply of around 40 miles, we can travel further if required, please ask.

Products supplied will be Designated Concrete, Design Concrete, Standardised Prescribed Concrete and Proprietary Concrete. The plant will also provide special products including Standard Sand Cement screeds, Flowing Concrete, Self Compacting Concrete, Watertight Concrete, Waterproof Concrete, Foamed Concrete. For a list of some of our special products please click this link

We can provide solutions for limiting reinforcement costs through the use of Structural Macro Fibre Concrete,  reducing shrinkage where applicable with Anti Shrinkage Agents etc. We also offer air entrainement and polyfibre concrete and combinations of the two for external slabs subject to winter frost attack

Grange operate a dedicated technical resource in line with our 3rd party accreditation, our products are constantly tested and cross checked to national standards.

Grange Concrete supplies in the region of 40,000 - 50,000m3 of concrete per annum into the Dumfries and Galloway market. The business has been built on a policy of customer service and after care. This policy applies to every load of concrete leaving the plant gates, whether it be a load into the local building trade, or local farming market, or a major construction project. 

Recent major projects supplied by Grange Concrete include Dumfries Hospital, Harestanes Windfarm, Craig Windfarm,  A75 Upgrade 2014, Minnygap Windfarm, Ewe Hill Wind Farm, Black Esk Reservoir, Carlisle Airport and many more

The following locations fall within the scope of the new plant:

Dalmellington, Wigtown, Creetown, Gatehouse-Of-Fleet, New Galloway, Mossdale, Dundrennan, Auchincairn, Kirkkudbright, Borness, Borgue, Colvend, Kipford, Southerness, New Abbey, Springholm, Crossmichael, Crocketford, Corsock, Balmaclellan, St Johns Town of Dalry, Carsphairn, Twinholm, Ringford, Ruthwell, Dumfries

Below are a couple of videos of Grange in action

If you have any inquiries about the new plant please contact us by phone or on the email to the left

20170214 122608

 

LOGO Transparent cropped small1 notext

Kirkburn Industrial Estate

Lockerbie

DG11 2FF

Telephone: 01576490490

info@grangequarry.co.uk

Download Our Full Contact List Here

Concrete Society

ConcSoclogoNEW BLUE2955

Grange are members of the Concrete Society
We support the aims and objectives of the society in all aspects of our supply

 

BSI Assurance Mark ISO 9001 KEYB 1

ISO 9001-big

Go to top